The most common method of electricity production is Thermal Generation, which is based on converting the thermal energy of fossil fuels into electricity. Thermal power plants (TPPs) are, in turn, one of the main ways of producing electricity worldwide.

LLC «Comprehensive Energy Solutions» has been providing a full range of engineering services at energy facilities since 2007, including:
— Design
— Construction and maintenance of power plants of various capacities

The company has access to the technologies, knowledge, and experience necessary for the successful commissioning of thermal power equipment of any type.
Today, «Comprehensive Energy Solutions» is one of the leaders in commissioning works in the energy construction market of the Russian Federation.
Over the years, the company has commissioned new thermal generation facilities with a total capacity of 8.3 GW.

Between 2011 and 2025, the company has performed commissioning works and put into operation the following energy facilities:


Reconstruction of the Chelyabinsk CHP 1 (Combined Heat and Power Plant) with decommissioning of the old section

PJSC “Forward Energy”



Irkutsk CHP 11 (Units 10, 11, 12)

LLC “Baikal Energy Company”



Construction of a new complex for propylene production via propane dehydrogenation and propylene derivatives (DGP 2) at LLC “Zapsibneftekhim”



Lushnikovskaya PSU 250

«Kazanorgsintez» PJSC



NDP Chelyabinsk TPP-1

«Fortum»



Ridder boiler house

«Kazzinc»



Udarnaya HPP

«Technopromexport»



Troitsk boiler house

«OGK-2»



Nevinnomysskaya GRES

«Enel»



SVEZA UST-IZHORA

«Sveza»



Pregolskaya HPP

«Inter RAO Engineering»



Norilskaya CHPP-2

Power Machines LLC



Voronezhskaya CHPP-1

«Quadra»



Krasnoyarskaya CHPP-1

Siberian Generating Company LLC



Krasnoyarskaya TPP-3

Siberian Generating Company LLC



Yamal LNG

«Yamal LNG»



Argayashskaya CHPP

«Fortum»



LNG Plant Gryogas-Vysotsk

«Cryogas»



Permskaya GRES PU 4

«Inter RAO Engineering»



Chelyabinsk GRES

«Fortum»



Verkhnetagilskaya GRES

«Inter RAO Engineering»



Yuzhnouralskaya GRES-2

«Inter RAO Engineering»



Chelyabinskaya CHPP-3

«Fortum»



Priobskaya GTPP

«RN-Yuganskneftegaz»



Primorskaya HPP

«Inter RAO Engineering»



Nyaganskaya GRES

«Fortum»



Yuzhnoye Hylchuyu Central Substation

«Naryanmarneftegaz»