Performed works:
— Technical support and control over completion of C&A.
— Comprehensive control of commissioning.
— Development of detailed grid schedule for C&A and commissioning of GTU and STU.
— Analysis of commissioning programmes, issuing comments on the programmes.
— Determination of the critical path for completion of C&A and commissioning.
— Drawing up of commissioning programmes.
— Mode adjustment of ZPODV equipment.
Equipment:
— Gas turbine units type SGT5-4000F, steam turbine unit type SST5-3000 with condensing unit type SCon 1000;
— Hydrogen cooled electric generatorSGen5-2000H manufactured by Siemens.
— Horizontal heat-recovery boiler with three pessure levels with natural circulation and intermediate steam superheating supplied by REMKO CJSC, Russia.