Performed works:
— Technical assistance in acceptance of the gas turbine and auxiliary installation systems.
— Commissioning of the gas turbine unit.
— Commissioning of RPA and secondary switching of electrical equipment of the gas turbine unit.
— Comprehensive commissioning on the equipment of external connections of the gas turbine unit I&C equipment.
Equipment:
— Gas turbine unit SGT5-4000F manufactured by Siemens.
Integrated Energy Solutions LLC © 2026 All rights reserved.