Completed works:
— Performing a set of works as the general contracting organisation
— A set of works for the construction of a thermal chamber (TK 1)
— A set of works for the installation of the plant’s technical water supply system
— Installation of equipment in the main gas turbine unit (GTU) building
— Installation of equipment in the main steam turbine unit (STU) building and the combined auxiliary building (CAB). Installation of water treatment and water chemical regime (WCR) facilities in the STU section
— A set of works for the construction of tank facilities in the CAB section
— Installation of an emergency oil drain tank for turbines
— Installation of an emergency network water drain tank
— Installation of a block modular steam generating unit
— A set of works for the construction of a trestle for process pipelines and cable trays
— A set of works for the construction of a metering facility building
— A set of works for the construction of a make up water pumping station
— Installation of a fire suppression control unit
— A set of works for the construction of an evaporative fan sectional cooling tower
— A set of works for the construction of a switching chamber
— Installation of a reagent dosing unit
— A set of works for the construction of entrance gates No. 1 and No. 2
— Reconstruction of the peak boiler house pipelines
— Construction and installation works in the building of the main switchgear (10 kV) and the main control board, including the administrative and бытовых building
— Installation of a fence around the industrial site of the Chelyabinsk CHP 1
— A set of works for the installation of a water treatment scheme in the CAB section
— A set of works for the construction of a conductor trestle
— A set of works for the construction of heat network make up accumulator tanks
— A set of works for the construction of condensate storage tanks
— A set of works for the construction of a scrap metal storage facility
— A set of works for the construction of roads
— Construction and installation works for the gas supply to process equipment
— Construction and installation works for electrical supply and low current systems
— Construction and installation works for water supply and sewage systems
— A set of works for the construction of a car park at the Chelyabinsk CHP 1
— A set of landscaping works
— A set of works for the construction of a gas distribution unit
— Installation of a sewage pumping station
— Installation of a steam turbine with a generator
— Reconstruction of the service and auxiliary building (SAB)
— A set of construction and installation works for the administrative and бытовыми building (AAB)
— A set of construction and installation works for the oil and container storage facility
— Reconstruction of the open switchgear facility ORU 110/35 kV at the Chelyabinsk CHP 1
— Commissioning works
Equipment:
— Steam turbine type R 26.9 3.5/0.08, manufactured by PJSC “Kaluga Turbine Plant”
— Turbogenerator TF 32 2U3 with air cooling, manufactured by PJSC NPO “ELSIB”; network heaters PSG 1300 3 16 1, supplied by LLC “Reinoltz”
— Feed pumps HGM 3/6, manufactured by LLC “KSB”
— Network pumps D500 1070, manufactured by “GMS LIVGIDROMASH”
— Evaporative fan sectional cooling tower type BMG 350, manufactured by LLC “TMIM”