Performed works:
— Consideration, analysis of design and detailed documentation, development of the commissioning project.
— Full scope of commissioning works on the equipment of double-blocks No. 1–2 and equipment of auxiliary facilities of double-blocks.
— Comprehensive commissioning of 110 kV outdoor switchgear (reconstruction).
— Coordination of all participants of commissioning, participation in the acceptance committees.
— Commissioning and testing of heat, water treatment, chemical water treatment, and electrical equipment.
— Incoming control and calibration of I&C in laboratory, including all local ACS and building systems (ventilation, air conditioning, heating, etc.).
— Round-the-clock supervision of leading specialists during start-up operations at the equipment.
— Comprehensive testing, warranty testing of gas turbines, steam heat recovery boilers, steam turbine units and double units as a whole, testing for commissioning of the facility.
Equipment:
— Gas turbines LM6000 PD Sprint manufactured by General Electric: 4 × 45.3 MW.
— Steam heat recovery boilers Pr-75-4.0-440D (PK-95) Vertical arrangement with afterburning device and loop water heating surfaces manufactured by ZiO OJSC Podolsk: 4 pieces.
— Steam turbine plants PT-25/34-3.4/1.3with adjustable production and heating outlets manufactured by Kaluga Turbine Works OJSC (KTZ): 2 × 25 MW.