Work performed:
— Vertical grading — Excavation of a foundation pit for the main building of CHP 11 (Units 10, 11, 12) — Installation of bored cast in place piles (4 700 units) — Construction of monolithic pile caps (55 000 m³ of concrete) — Construction of load bearing floors (23 000 m³ of concrete)
Equipment:
– Not provided