Performed works:
— Adjustment and commissioning of ventilation and air-conditioning systems in the buildings of the checkpoint and the administrative building.
— Adjustment and commissioning of the heat supply and heating systems of the checkpoint and office buildings.
— Adjustment and commissioning of the cold and hot water supply systems of the checkpoint and office buildings.
— Adjustment and commissioning of the fire-fighting pumping station and fire-fighting water supply.
— Adjustment and commissioning of the electrical equipment of the checkpoint, office building, warehouse and NSPT.
— Adjustment and commissioning of rain and domestic sewerage systems.
Integrated Energy Solutions LLC © 2026 All rights reserved.