Work performed:
— Conducting of the PNR of technological, electrical equipment, ACS, engineering networks and structures, heat and power equipment, equipment of heating, heat supply, ventilation and air conditioning systems.
— Installation support of the PNR stage.
— Performance of the mode and adjustment works with development of NTD on fuel use.
Equipment:
– Gas turbine – SGT5-2000E 188.4 MW
– Steam turbine SST600-EP – 98.9 MW
– John Cockerill recovery boiler – 311 t/h.
Integrated Energy Solutions LLC © 2026 All rights reserved.