Performed works:
— Earth works, driving of more than 900 reinforced concrete piles.
— Construction of reinforced concrete foundations for wind turbines over 4500 m³.
— Arrangement of on-site roads, installation sites, crane installation sites.
— Improvement and landscaping of the site.
— Electrical installation and commissioning works, Creation of AIMS KUE systems, APCS, PIES SOAS, communication networks, video surveillance, RACS, FSS, WACS, automatics of GPFC.
— Installation of CL-35 kV, supply of equipment, materials, spare parts.
— Integration of process systems of the wind farm with the process information collection centre.
— Functioning as the head commissioning organisation.
— Reconstruction of the existing 110/35 kV substation, dismantling.
— Arrangement of foundations for equipment, immersion of metal screw piles.
— Arrangement of the pedestal for block-modular buildings.
— Expansion of 35 kV complete switchgear, electrical installation.
— Commissioning and creation of systems CAEMS, RZiA, PIES SOAS, communication networks, SOVN, RACS, FSS, WACS.
— Designing, preparation of a full package of ID, programmes, instructions
Equipment:
— Wind power unit type V126-3.6 MW manufactured by VESTAS (Denmark): 14 pieces.
— Expansion 35 kV complete switchgear of BMZ manufactured by Electroshield-TM Samara Group of Companies CJSC.