Performed works:
— Installation of main and auxiliary equipment of 110 kV outdoor switchgear (40 MV·A power transformers, 400 kV·A auxiliary transformers, neutral earthing resistors, switches, metal gantry isolators, etc., cable laying and disconnection).
— Commissioning of installed equipment, development of commissioning and operating documentation, including bringing foreign manuals in line with the requirements of the Russian National Technical Regulations.
— Energisation of 35/110 kV substation.
— Participation in commissioning of wind generator equipment (static and dynamic).
— Preparation of a full set of as is documentation.
Equipment:
— 14 wind power plants (WPP) type DF110-2500LT;
— Substation 35/110 kV, including 110 kV outdoor switchgear, surge current limiter, complete switchgear – 35, manufactured by Electroshield-TM Samara Group of Companies CJSC, control room (PIES SOAS system, CAEMS, ERS manufactured by Prosoft.EMC ACS system manufactured by Siemens).